Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
15 Cards in this Set
- Front
- Back
The Production Cycle
|
"a recurring set ofbusiness activities and related information processing operations associated with the manufacture of products" (462)
|
|
Bill of materials
|
part #, Descr, Quantity (465)
|
|
Operations list
|
step sequence, what equipment, step time length (466)
|
|
MRP II
|
Manufacturing Resource Planning - balances materials needs with sales forecasts (466)
|
|
Lean manufacturing
|
Goods and materials acquired according to immediate need (Like JIT system) [466]
|
|
MPS
|
Master Production Cycle (467)
|
|
CIM
|
Computer-Integrated Manufacturing - +IT, Robots, compy controlled stuff (470)
|
|
Threat: Poor Production design
|
Control: improved info about effects of product design changes on costs; detailed data on warranty and repair costs (476)
|
|
Threat: Over/Under Production
|
Control: Accurate production planning system; proper production order approval (476)
|
|
Threat: suboptimal investment in fixed assets
|
Control: Review and approval of Fixed-asset transactions; budgetary controls (476)
|
|
Threat: theft of inventories and fixed assets
|
Control: Restrict physical access; document mat movt; ID/Track Fixed-assets; Periodic INV count; Proper documenting and review of transactions of FIxed-Asset disposal; Insurance (476)
|
|
Threat: Disruption of operations
|
Control: Backup power supplies; disaster recovery plans; evaluation of disaster preparedness (476)
|
|
Threat: Inaccurate cost Data
|
Control: data entry/processing controls; bar code / RFID; reconcile physical counts with records (476)
|
|
Threat: Loss, alteration or unauthorized disclosure of data
|
Control: Backup and disaster recovery plans; logical/physical access controls; ERP system for segregation of dutires; encryption; data transmission controls (476)
|
|
Threat: Poor performance
|
Control: develop/review perf reports (476)
|