Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
153 Cards in this Set
- Front
- Back
AFFF
|
AQUEOUS FILM FORMING FOAM
|
|
AFFF AGENT DELIVERY SYST
|
FIGHTS LARGE CLASS "B" FIRE
|
|
HOW MANY AFFF STATIONS?
|
2
1-70-1-A (FWD PALLET) 1-300-1-Q (AFT DECON ST) |
|
AFFF CONCENTRATE
|
6% AFFF
94% SEAWATER |
|
CAPACITY OF EACH AFFF TANK
|
600 GALLONS
|
|
AFFF ON STBY
|
300 EACH TANK
5 GALLON BLUE BUCKETS |
|
AFFF TOTAL GALLONS ONBOARD
|
1800
|
|
AFFF CONCENTRATE PUMP
|
DELIVERS AFFF CONCENTRATE FROM STORAGE TANK THROUGH THE VENTURI PROPORTIONER INTO THE DISTRIBUTION PIPING
|
|
BALANCING VALVE
|
CONTROLS FLOW OF AFFF CONCENTRATE,EITHER BACK TO THE TANK OR TO THE POWERCHECK VALVE.
AFFF PRESSURE IS EQUAL TO FIREMAIN PRESSURE ENSURING THE PROPER FOAM MIX |
|
MAGNETIC SIGHT GLASS
|
DETERMINE THE LEVEL OF AFFF IN TANK
|
|
SEAWATER FLOW CONTROL VALVE (HYCHECK VALVE)
|
INCORPORATES A CHECK VALVE WHICH WILL PREVENT AFFF BEING FORCED BACK INTO THE FIREMAIN
|
|
SOLENOID OPERATED PILOT VALVES (SOPV's)
|
EACH AFFF HAS ONE MASTER
FWD AFFF HAS 3 SERVICE AFT AFFF HAS HAS SIX SERVICE |
|
MASTER SOPV
|
CONTROLS THE SEAWATER FLOW CONTROL VALVE AND AFFF FLOW CONTROL VALVE (HYCHECK VALAVE)
|
|
SERVICE SOPV ACTIVATION WILL CAUSE?
|
THE MASTER AND SERVICE SOPV's TO ACTIVATE ALLOWING THE AFFF TO FLOW TO THE MAIN LOOP AND TO WHICHEVER SERVICE-WAY (BILGE SPRINKLING OR VERTREP ST SPRINKLING) IS ACTIVATED
|
|
AFFF LOOP
|
CONTINUOUS LOOP THAT FUNCTIONS SIMILAR TO THE FIREMAIN LOOP
|
|
HALON 1301 SYSTEM
|
EXTINGUISHES FIRES THAT ARE BEYOND THE CAPABILITY OF FIRE EXTINGUISHING APPARATUS AND WHERE ABANDONMENT IS NECESSARY
|
|
HALON BOTTLES
|
STORES LIQUEFIED HALON PRESSURIZED WITH NITROGEN TO 600 PSI @ 70 DEGREES F
|
|
5LB CO2 ACTUATION BOTTLE
|
LOCATED AT EACH ACTIVATION POINT
USED TO ACTUATE THE SYSTEM |
|
VENTILATION SHUTDOWN PRESSURE SWITCH
|
SHUTS DOWN VENTILATION SYSTEM PRIOR TO THE ACTIVATION OF HALON, PREVENTING HALON FROM BEING REMOVED BY EXHAUST VENTILATION.
ACTIVATED IMMEDIATELY AFTER 5LB CO2 IS ACTUATED |
|
CPS AIR SWEEP PRESSURE SWITCH
|
CLOSES CPS AIR SWEEPS. ONLY AFFECTED SPACES ARE AUX 1, MER 1, MER 2
|
|
TIME DELAY DEVICE
|
PROVIDES A DELAY BETWEEN SYSTEM ACTIVATION AND ACTUAL HALON RELEASE, ALLOWING TIMEFOR VENTILATION SHUTDOWN
|
|
TYPES OF TIME DELAYS
|
30 SEC- UNMANNED
60 SEC- MANNED |
|
60 SEC TIME DELAY FOR HALON
|
AUX 1, MER 1, MER 2, 3 GEN
|
|
30 SEC TIME DELAY FOR HALON
|
GTM/GTG MODULES AND FLAMMABLE LIQ ISSUE/STORAGE
|
|
TIME DELAY BYPASS SWITCH
|
IMMEDIATE DISCHARGE OF HALON BY BYPASSING THE TIME DELAY ASSEMBLY
|
|
WHO HAS AUTHORITY FOR RESERVE HALON IF PRIMARY IS BAD, ONLY AFTER THE CAUSE OF PRIMARY HALON BAD HAS BEEN CORRECTED?
|
DCA
|
|
CO2 EXTINGUISHER
|
PRIMARILY FOR EXTINGUISHING ELECTRICAL FIRES BUT CAN BE USED ON A AND B FIRES IF APPLIED BEFORE THE FIRE IS TOO LARGE
|
|
MAXIMUM EFFECTIVE RANGE OF CO2 EXTINGUISHER
|
4 TO 6 FT
|
|
WEIGHT OF CO2 IN PORTABLE BOTTLE
|
15 LBS
|
|
MAX TIME THE CO2 PORTABLE BOTTLE SPRAYS FOR?
|
40-45 SEC CONTINUOUS USE
|
|
WHAT CAN OCCUR BECAUSE CO2 HAS NO COOLING EFFECT ON THE FIRE?
|
REFLASH
|
|
SAFETY PRECAUTION WHEN DISCHARGING CO2 BOTTLE
|
KEEP CYLINDER IN CONTACT WITH THE DECK SO THERE IS NO STATIC BUILDUP CHARGE
|
|
WHAT IS REQ IN A SMALL SPACE AFTER CO2 HAS BEEN DISCHARGED?
|
SCBA
|
|
PKP EXTINGUISHER
|
CLASS B FIRES
LAST RESORT FOR C (HIGHLY CORROSIVE) |
|
PKP ATTACKS WHAT?
|
CHAIN REACTION REQ TO SUSTAIN THE FIRE
|
|
PKP BOTTLES CARRIED ON BOARD
|
18 LB
27 LB |
|
DISCHARGE TIME OF PKP BOTTLE
|
10 SECS-18LB
11 SECS- 27LB |
|
EFFECTIVE RANGE OF PKP BOTTLES
|
19 FT- 18LB
21FT- 27LB |
|
PORTABLE AFFF BOTTLES
|
PRIMARY USED FOR SMALL "B" FIRES, DEEP FRY FIRES
SMALL "A" FIRES, VAPOR SECURE A SMALL FUEL SPILL PREVENT FIRE AND USED DURING HOT WORK WATCH |
|
AFFF EXTINGUISHER STORAGE
|
2-2 AND 1/2 GALLONS
|
|
AFFF EXTINGUISHER
|
PREMIXED SOLUTION OF AFFF CONCENTRATE AND FRESH WATER
100 PSI @ 70 DEGREES F |
|
AFFF EXTINGUISHER WEIGHT
|
28 LBS
|
|
WHAT IS THE SOAK TIME FOR HALON PRIOR TO RE-ENTERING A MAIN SPACE?
|
15 MIN
|
|
WHAT ACTIVATES THE HALON SYSTEM?
|
CO2
|
|
WHAT FIXED FIRE FIGHTING EXTINGUISHING SYSTEM IS INSTALLED IN THE MAIN SPACES?
|
HALON
|
|
AT WHAT TEMPERTURE DOES HALON TURN TOXIC?
|
900 DEG. F
|
|
WHAT DOES EEBD STAND FOR?
|
EMERGENCY ESCAPE BREATHING DEVICE
|
|
HOW LONG WILL THE EEBD LAST?
|
10 MINS
|
|
ON THE EEBDS WHAT INDICATES A GOOD EEBD?
|
THE NEEDLE IS THE GREEN RANGE
|
|
WHAT TYPE OF FUEL DOES THE P-100 USE?
|
JP-5 OR DFM
|
|
COVERED BY FWD AFFF
|
AUX 1, MER 1,FWD VERTREP
|
|
WHERE ARE THE AFFF SEGREGATION VALVES
|
MESS DECKS AND MAIN MEDICAL, FRAME 220
|
|
SCBA
|
SELF CONTAINED BREATHING APPARATUS
|
|
COLLECTIVE PROTECTIVE SYSTEM
|
3 ZONES
|
|
WHAT IS THE HALON PROCESS?
|
5 LB CO2 ACTUATOR-PULL PIN AND PULL ON ACTUATOR LEVER. CO2 GOES FROM ACTUATOR TO 1ST PRESSURE SWITCH
|
|
WHAT HAPPENS AT 1ST PRESSURE SWITCH
|
VENTILATION SHUTS DOWN
|
|
CO2 TRAVEL TO 2ND PRESSURE SWITCH AND WHAT HAPPENS?
|
ALARMS ARE ACTIVATED
|
|
WHAT HAPPENS AT 3RD PRESSURE SWITCH
|
VENT DAMPNERS SHUT DOWN
|
|
WHAT HAPPENS AFTER3RD PRESSURE SWITCH AND VENT DAMPNER SHUTS DOWN
|
TIME DELAY-
30 SECS: UNMANNED 60 SECS: MANNED |
|
WHAT HAPPENS AFTER TIME DELAY
|
CO2 GOES TO 4TH PRESSURE SWITCH
|
|
WHAT HAPPENS AT 4TH PRESSURE SWITCH?
|
DISCHARGE ALARM
|
|
RED LIGHT ON HALON
|
HALON DISCHARGED
|
|
HALON LIGHTS WHITE
|
PWR AVAILABLE
|
|
AMBER LIGHTS AMBER
|
HALON ACTIVATED
|
|
WHERE IS THE HALON STATION FOR #3 GTG
|
3 GEN
|
|
HALON PROTECTED SPACES
|
AUX 1
MER 1 MER 2 #3 GTG ROOM FLAM LIQ STO FLAM LIQ ISSUE 1A,1B,2A,2B GTM 1,2,3 GTG |
|
CHEMICALLY INTERRUPTS THE COMBUSTION CHAIN REACTION
|
HALON 1301
|
|
EMERGENCY AFFF HOSE OUTLETS
|
1 AND 1/2" VALVES INSTALLED IN THE AFFF LOOP AT LEAST EVERY 50FT
|
|
SINGLE AGENT (AFFF) HOSE REEL
|
LOC ON DC DECK FOR ENG SPACE RE-ENTRY, FLIGHT DECK AND MACHINERY SPACES
|
|
GAS MASK
|
MCU-2P
|
|
WHAT DOES THE ACRONYM MOPP STAND FOR?
|
MISSION ORIENTATED PROTECTIVE POSTURE
|
|
HOW MANY MOPP LEVELS ARE THERE?
|
4
|
|
WHAT MOPP LEVEL HAS THE HIGHEST STATE OF READINESS?
|
4
|
|
HOW MANY DECON STATIONS ONBOARD?
|
2
BY SSES (PORT) BY HELO HANGAR ENTRANCE (STRB) |
|
HOW MANY ZONES DOES THE DECON STATION HAVE?
|
4
|
|
ZONES OF DECON STATION
|
OUTER CLOTHING UNDRESSING
INNER CLOTHING UNDRESSING SHOWER CONTAMINATION PURGE LOCK (CPL) |
|
OUTER CLOTHING UNDRESSING
|
TAKE OFF ACPG, LEAVE ON MASK
|
|
INNER CLOTHING UNDRESSING
|
TAKE OFF UNDER GARMENTS, LEAVE ON MASK
|
|
SHOWER
|
LEAVE ON MASK, SHOWER, AFTER ICUA
|
|
CONTAMINATION PURGE LOCK
|
TAKE OFF MASK, MEDICAL EVAL
|
|
CHEMICAL WARFARE DIRECTIONAL DETECTOR (CWDD)
|
DETECTS AND IDs A NERVE AGENT CLOUD AT A DISTANCE USING PASSIVE INFRARED IMAGE SENSOR
CAN BE MOUNTED ON PORT AND STRB BRIDGE WINGS, NORMALLY STORED ON BRIDGE OR LOCKERS |
|
IMPROVED POINT DETECTION SYST (IPDS)
|
SHIPBOARD SYST THAT OPERATES AN AUTOMATIC AND CONTINUOUS AIR SAMPLING DETECTOR
USED TO DETECT NERVE AND BLISTER AGENTS. SETS OFF ALARM ON THE BRIDGE AND DC WORKSTATION |
|
M-256A1 CHEMICAL DETECTOR KIT
|
PORTABLE CAPABILITY FOR DETECTING OPERATIONAL CONCENTRATIONS (LIQ AND VAPOR) OF NERVE, BLISTER, AND BLOOD AGENTS
|
|
M-256A1 CHEMICAL DETECTOR KIT CONTENTS
|
12 SAMPLER DETECTORS, A BOOKLET OF M-8 PAPER, AND A PLASTIC OPERATIONAL INSTRUCTION CARD
|
|
SHELF LIFE OF M256A1
|
5 YEARS
|
|
SAMPLER DETECTORS
|
WILL DETECT NERVE (G AND V) BLISTER (L AND CX) AND BLOOD AGENTS (AC AND CK)
|
|
M-8 PAPER
|
MOUNTED IN DESIGNATED SPOTS OUTSIDE THE SKIN OF THE SHIP AND NEAR CPS VENTILATION DUCTS OR WATERTIGHT ACCESSES PRIOR TO CHEMICAL ATTACK
|
|
M-8 RED
|
BLISTER (H AND L)
|
|
M-8 YELLOW
|
NERVE (G SERIES)
|
|
M-8 GREEN
|
NERVE (V SERIES)
|
|
M-8 RESPONSE TIME
|
20 SECS
|
|
M-9 PAPER
|
DETECTS LIQUID CHEMICAL AGENTS BY COLOR CHANGE (RED)
|
|
FALSE POSITIVES FOR M-9
|
BLUE, YELLOW, GREEN, GRAY, OR BLACK SPOTS
|
|
M-9 RESPONSE TIME
|
10 SECS
|
|
MOPP LEVEL 0
|
PROTECTIVE MASKS FITTED
|
|
MOPP LEVEL 1
|
MED SUPPLIES ISSUED TO PERSONNEL
|
|
MOPP LEVEL 2
|
MASK CARRIED
SET UP DECON ST PERFORM OP TEST PF CMWD |
|
MOPP LEVEL 3
|
INSTALL CANISTERS ON MASKS
DON ACPG SET GQ ACTIVATE CMWD INTERMITTENTLY CIRCLE W |
|
MOPP LEVEL 4
|
DON MASK
HOOD UP ON ACPG ACTIVATED CMWD CONT. |
|
SHELF LIFE OF CANISTERS
|
5 YEARS
|
|
CANISTERS AFTER UNSEALING
|
60 DAYS UNSEALING IN NON-CHEM ENV
30 DAYS EXPOSURE |
|
ATROPINE
|
NERVE AGENT ANTIDOTE
INJECT IN THIGH UNSUP USE ONLY 3 |
|
2-PAM CHLORIDE
|
CONJUCT W/ ATROPINE TO COMBAT SYMPTOMS
ADMIN AFTER ATROPINE, 1 FOR 1 MAX 3 INJECT UNSUP |
|
M-291 SKIN DECON KIT
|
DECONS LIQ AND CHEM AGENTS FROMEXPOSED SKIN AREAS BY PHY REMOVAL, ABSORPTION, AND NEUTRALIZATION
|
|
HOW MANY PACKETS IN M-291 DECON KIT
|
6
|
|
HOW MANY APPS FOR M-291 DECON KIT
|
6 PKTS, 3 COMPLETE SKIN APPS
|
|
SHELF LIFE OF M291 DECON KIT
|
5 YRS
|
|
HOW MANY TIMES CAN YOU WASH THE ACPG
|
6
|
|
HOW MANY DAYS CAN YOU USE ACPG AFTER UNSEALING
|
24 HRS CONTAM
45 UNCONTAM 120 DAYS HAVE ELAPSED SINCE OPENING ORIGINAL FACTORY SEALED PACKAGING |
|
M-8 BOOKLET
|
25 PERFORATED SHEETS OR 50 SINGLE SHEETS
|
|
IS R134 A TOXIN
|
NO, NOT UNTIL HEATED PAST 750 DEG. F
|
|
HOW DOES R135 KILL YOU
|
KILLS BY SUFFOCATION FILLS THE LUNGS BY DISPLACEMENT
|
|
H2S
|
DANGEROUS, CAUSES DEATH
|
|
HANDLING REFRIGERANT
|
DISPLACES OXYGEN AND AT 250 DEGREES AND ABOVE IT BECOMES TOXIC GAS
|
|
STEEL SHORING LENGTHS
|
3 BY 5
6 BY 11 |
|
STEEL SHORING LOC
|
REP 5
DISBURSING |
|
STEEL SHORING PRESSURE
|
3 BY 5-
COLLAPSED. 20000LBS EXPANDED. 12000LBS 6 BY 11 COLLAP. 20000LBS EXPAND. 6000LBS |
|
SHORING TYPES
|
I, H,K
|
|
I SHORING
|
STRONGEST- HATCHES SCUTTLES
|
|
H SHORING
|
SMALLER COMPARTMENTS
|
|
K SHORING
|
LARGER COMPARTMENTS
|
|
JUBILEE PATCH
|
PRESSURE UP TO 100 PSI
|
|
EMERGENCY WATER ACTIVATED REPAIR PATCH (EWARP)
|
UP TO 150 PSI
NOT USED ON PW PIPES |
|
SOFT PATCH
|
UP TO 150 PSI
|
|
BOX PATCH
|
METAL BOX FITTED W/ GASKET
|
|
BUCKET PATCH
|
BUCKET FITTED W/ GASKET
|
|
TYPES OF EDUCTORS
|
S TYPE AND PERIJET
|
|
HOW MANY EDUCTORS DOES MAIN DRAIN USE
|
3
|
|
BOX FAN RATED AT
|
DISPLACES 3200 CUBIC FT PER MIN OF AIR
115 VOLTS AC |
|
RAM FAN RATED AT
|
2000 FPM
|
|
DISCHARGE RATE W/ P100
|
100 GPM @ 83 PSI
|
|
P100 PRIMARY USE
|
FF AND DEWATERING
|
|
WHERE DOES P100 CONNECT TO W/ HOSE
|
OVERBOARD DISCHARGE
|
|
USED FOR DE-FLOODING
|
P100
ELECTRIC SUBMERSIBLE PUMP EDUCTORS |
|
TYPES OF SCBA TANKS
|
30 MIN AND 45 MIN
|
|
WHAT IS SECONDARY DRAINAGE
|
SYSTEM THAT PROVIDES FOR DEWATERING OF CERTAIN SPACES THAT HAVE A FLOODING RISK
|
|
HOW MANY WAY TO CHARGE SCBA
|
QUICK CHARGE
STANDARD |
|
ALPHA FIRE
|
ASH, DRY MAT, BOOKS
WATER |
|
BRAVO FIRE
|
THICK BLACK SMOKE- GAS,FUEL
HALON, AFFF, PKP |
|
CHARLIE FIRE
|
ELECTRICAL- BLUE SMOKE
CO2 |
|
DELTA FIRE
|
METALS
WATER, JETTISON |
|
1ST STAGE REGULATOR
|
REDUCES PRESSURE TO 100 PSI
|
|
2ND STAGE REGULATOR
|
REDUCES AIR TO BREATHABLE AIR
|
|
NFTI
|
NAVY FIREFIGHTING THERMAL IMAGER
|
|
SCBA REFILLING STATIONS
|
REP 5 AND 3
|
|
CO2 BOTTLE FIRES?
|
A AND C
|
|
PKP BOTTLE TYPES
|
18 AND 27 LB
|
|
PKP BOTTLE FIRE TYPE
|
B
LAST RESORT- C |
|
SCBA STORED AT WHAT?
|
4500 PSI
|
|
HOW MANY FIRE PUMPS? RATED AT? LOC?
|
6 @ 1000GPM @ 150 PSI
FWD VCHT AUX 1 MER 1 MER 2 SHAFT ALLEY 3 GEN |
|
WHAT DOES EVERY FIRE PUMP HAVE
|
SEA CHEST
FP #6 HAS 2 (3 GEN) |
|
WHAT TYPE OF FIRE MAIN?
|
8" VERTICAL OFFSET LOOP
|
|
WHAT VCHT HAS A FP
|
FWD
|