Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
7 Cards in this Set
- Front
- Back
What Must agencies do in fulfilling the requirements of 10USC 2305 (a)(1) ? |
1 specify needs using market research. 2 promote full and open competition 3 only include realistic provisions |
|
What is the order of precedence for required documents? |
Documents mandated by law, performance oriented documents, detail designed oriented Standards, specifications and related publications. |
|
What is the preferred method for acquiring services |
Performance based acquisition methods to the maximum extent practicable. |
|
How must COs disseminate information on proposed contract actions? |
1. contracts expected to exceed 25k by synopsize 'ing in the g p e. 2. Expected to exceed 15k but not 25k by displaying in public place or by appropriate electronic means . |
|
For which acquisitions' must COs transmit a notice to the g p e? Are there any exceptions to this rule? |
Contract action meeting threshold, modification to existing contact, contract action in any amount. |
|
What are the wage rate requirements for construction? |
No less than the prevailing wage rate determined by the secretary of labor. |
|
What are the service contract labor standards? |
Over two thousand five hundred south contain minimum wage and friend benefits, safe and sanitary working conditions, notifications to employees of minimum allowable compensation |