10 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
TRADITIONAL METHOD Cost/Time/Quality:
Traditional methods are biased more towards control of cost and quality than control of time.
TRADITIONAL METHOD Risk strategy:
Is fair and balanced between client and contractor
2 stage shifts towards contractor
D&B Cost/Time/Quality:
Design and Build methods are biased more towards control of cost and time than control of quality.
D&B Risk strategy:
Is biased heavily towards the contractor
MANAGEMENT METHODS Cost/Time/Quality:
Biased more towards control of time and quality than control of cost.
MANAGEMENT METHODS Risk strategy:
Is biased heavily towards the client
3 tendering methods
Negotiated
Open
Selective
Negotiated
single company
specialist project
Bundled
ongoing
Selective
3-6
limited input
select relevant
Open
lots
price over quality