• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

MPDE means?

Multiple of Direct Personnel Expense

MOC applicable only to non creative work. Based on hours spent.

Multiple Direct Personnel Expenses


((AN+CN+TN) x M)+R



AN=Architects Rate x Hour


CN=Cosultant Rate x Hour


TN= Tech Staff x Hour


M=Multiplier(1.5-2.5)


R=Reimbursible

MOC prequently used where there is continuing relationship in series of project?

Professional Fee Plus Expenses

MOC applied to government projects ore paper works and time consuming?

Lump Sum or Fixed Fee

MOC Attending mettings confereces or trips, conducting ocular inspection of possible project site?

Per Die, Hoorarium, Plus Expenses

SPP provide more than MOC on project?

Mixed Method of Compensation

MOC based on the PPC shall be detailed in Architects Guideline?

Percentage of Project Costruction Cost