24 Cards in this Set
- Front
- Back
- 3rd side (hint)
Architect works on a
Development Concept. size & interrelationship of Interior Spaces contribute to the Physical, Visual, Intellectual & Emotional Comforts of the intended end-users. |
Architectural Interiors (AI)
|
% of A.I. Work Cost
COST OF WORK = total cost of all fixtures & accessories that were installed in the Project. Architect's Fee = 15 % (12-20% range) Consultant's Fee = 5 % a. Preliminary Design = 30% of the Fee b. Final Design = 50 % of the Fee c. Completion of the Porject = 20% of Fee |
|
detailed planning & design
to control sound trans- mission for compatibility with Architectural Design Concept. |
Acoustic Design Services
|
depend on the complexity of the Work
Architect's Fee = 10 - 15 % |
|
detailed planning & design
of Light Transmission, timing and control for compatibility with the Architectural Design Concept. |
Architectural Lighting
Layout & Design |
depend on the complexity
of the Work |
|
Architect studies existing
environment in relation to the building / structure & consequently lays out the areas / grounds immediately surrounding the building / structure. |
Site Development Planning
(SDP) Services |
depend on the estimated cost of Civil
Works & Landscaping Works & on the magnitude & complexity of the Work. Landscape Design = 5 % |
|
the specialist Architect
provides a multi-dimensio- nal point-of view to a 2- dimensional physical plan. Physical Planning - refers to the orderly arrangement of a piece of land or prop. on which vertical structures as well as horizontal deve- lopments are to be proposed. |
Site & Physical Planning
Services (incl. Master Dev. Planning, Subdivision Planning & Urban Design) |
For Moderately flat terrain
TYPE 1 : 50 hectares or less = 5000 / h.a TYPE 2: 100 hectares or less = 3000 / h.a. TYPE 3: 100 hectares or less = 2000 / h.a. For rugged terrain = + 30 % |
|
concerned with the general quality
Project. c. Diagrammatic Layout of of the settings of the people & their activities, Construction Systems buildings & other natural and man-made phenomenon. |
Physical Planning
|
* Architects performing the LEAD ROLE.
* In planning for a building, he studies its interrela tionship with other structures, the surrounding environment, and their effect & impact on the ne boring areas. Specialist Architect - provides a multi-dimensiona point-of-view to a 2-dimensional physical plan. |
|
based on the concept of
expanded Physical Planning Services. covers the range of all services from Primary Data Gathering though the formulation of the MDP & the parallel preparation of the environmental impact assessment / statement (EIA / S) CDP Services - Non-physical or non-engineering compo- nents of the development plan. CDP Components: 1. Physical Component 2. Economic Component 3. Socio-Cultural Component 4. Transport Component 5. Legal & Administrative Component MDP Services - Physical Planning & Engineering Components of the Deve- lopment plan. |
Comprehensive Development Planning Services (CDP)
|
Man-months e.g. 22 man-days multiplied
by 8 man-hours, & multiplied by a factor to cover other direct & indirect costs (overhead). |
|
research, assessment,
recording, management, interpretation & conserva- tion of historical heritage. |
Historic & Heritage
Conservation & Planning |
|
|
arranges & formulates
methods of rating & ascertaining the value of structures or facilities which must be fully kept secured. |
Security Evaluation & Planning
|
|
|
methods of producing
building components in a highly engineered, efficient & cost-effective manner, parti- cularly for residential & commercial applications. |
Building Systems Design
|
|
|
provides the Owner with
means & measures to ensure the proper function & main- tenance of the building / structure & site after final inspection. |
Facillities Maintenance Support
|
|
|
recommends the systematic
process of ensuring that a building / structure's array of systems is planned, designed, installed & tested to perform according to the design intent & the building's operational needs. |
Building Testing &
Commissioning |
|
|
Building Environment Rating
System - needed to evaluate the environmental perfor- mance of a building & to encourage market migration towards Sustainable Design. a. credit-based b. flexible c. consensus-based & market - driven International Protocols: a. Philippine Solid Waste b. Clean Air & Clean Water Act c. DENR Administrative Issuances |
Building Environment Certification
|
|
|
scientific study on the built
environment's well-being in which building / structure can best maintain itself & prolong its life in a cost-efficient manner. |
Forensic Architecture
|
|
|
Appraisal - defined as an act
or process of estimating value. places value on the building / structure condition & defects & on its repair & maintenance, including the required impro- vements. |
Building Appraisal
|
|
|
conceives, chooses & develops
the type, disposition, arrange- ment & proportioning of the structural elements of an Architectural Work, giving due considerations to safety, cost- effectiveness, functionality & aesthetics. |
Structural Conceptualization
|
|
|
much more than the basic
knowledge of Site Analysis, Space Planning & Management Architectural Programming, & other services under SPP 201. |
Preliminary Services
|
|
|
much more than the basic
knowledge of Specification Writing, Estimation, & Quantity Survey, Arch'l Production, Arch'l Software, Arch'l Support Services & Contract Document Review. |
Contract Documentation
and Review Services |
|
|
much more than the basic
knowledge of Pre-Construction, Construction, Post-Construction, & other services under SPP 204, 206, and 207. preparation of the Fire Safety & Life Assessment Report (FALAR) required by RA 9514, the Fire Code of the Philippines & its 2009 IRR. |
Post-Design Services
(including Construction Services) |
|
|
more than the basic knowledge
of ALTERNATIVE DISPUTE RESO- LUTION (ADR) prescribed by RA 9285, the ADR ACT OF 2004 |
Dispute Avoidance & Resolution
|
|
|
Research Methods, Philippine
Architecture & its History, Architectural Materials & Finishes, Building Types & Standards, Architectural Design Trends, Architectural Writing & Architectural Photography. |
Architectural Research Methods
|
|
|
Planning & Design Processes for
Housing Developments, Recrea- tional & Tourism Estates, Health Care & Hospitality Facilities, Transportation & Communications Facilities, Production & Extractive Facilities Utility-related Developments, Secure Facilities, Business & Industrial Parks, Economic Zones & Community Architecture & the like. |
Special Building / Facility
Planning and Design |
|
|
Building Materials & Finishes,
Construction Methodologies, Building Envelopes including cladding & roofing systems, Architectural Fenestrations & Architectural Hardware, Fixtures & Fittings. |
Building Components
|
|
|
Types of Architectural Office
Operations, Management, Accounting / Finance / Taxation / Audit, Labor Code, Architectural Marketing & Project Development, Proposals / Negotiations / Contracts, Contract Administration, File Management & Limitations of Business Process Outsourcing (BPO) & Knowledge Process Outsourcing (KPO) Operations. |
Management of
Architectural Practices |
|