Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
7 Cards in this Set
- Front
- Back
Product Scope |
The product deliverables with their associated features and functions |
|
Project Scope |
The work the project will do to deliver the product of the project. |
|
|
|
|
Name the two management plans in the Scope Knowledge Area |
|
|
The Scope Management Plan may completed in stages. What are the possible stages? |
|
|
Name the three parts of Scope Management Plan |
|
|
Requirements Management Plan determines __ |
How the requirement will be gathered analyzed prioritized managed tracked |