Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
61 Cards in this Set
- Front
- Back
Fire Tetrahedron |
Oxygen, Fuel, and Heat |
|
SCBA vibe goes off when... |
Cylinder reaches 20-25% capacity, 1st stage regulator fails, cylinder air valve is first opened |
|
SCBA air pressure indicator must be no less than |
4000 psig |
|
Maximum length of wood shoring |
30x maximum thickness |
|
Operating time for EEBD |
10 minutes |
|
Canister life of M-50 is reduced to how many days when exposed to chemicals? |
1 |
|
Time delay for HALON system for gas turbine generator |
30 seconds |
|
Whose duty includes directing the damage control team through the team leader? |
Scene Leader |
|
What does the letter at the end of the compartment number represent? |
What type of compartment |
|
White phosphorus smoke classifies... |
Class D Fire |
|
What type of nozzle is used in the ship? |
1 1/2 in 95 gpm vari nozzle |
|
What sequence is used to operate an eductor to dewater a space? |
Open overboard discharge, open firemain actuator, open suction valve |
|
Where are the fresh water hoses located? |
CCS, CSER1, CSER2, CSER3, CSER4, CIC P/S |
|
Halon forms what gas when exposed to 900 degrees? |
Hydrogen Fluoride, Hydrogen Bromide |
|
What fire fighting system is used to protect ammunition magazines? |
Magazine Sprinkler System |
|
How is the magazine sprinklers automatically activated? |
Sense 160 degrees or over |
|
What pipe patching holds the most pressure? |
New jubilee patch |
|
What pressure does the 1st stage regulator on the SCBA reduce the pressure to? |
100 psi |
|
What type of fuel is used for P-100? |
JP-5 |
|
How many zebra valves in the main fire system? |
2 |
|
Net 80 |
DC Central |
|
Net 81 |
Repair 2 |
|
Net 82 |
Repair 3 |
|
Net 86 |
Repair 5 |
|
Emergency Battle Circuit |
X40J |
|
Order of MOPP from less likely to occurred |
MOPP 0-MOPP 4 |
|
What condition is set when ship is underway during peace time? |
Modified Zebra |
|
What dosimeter is issued during a radiological attack? |
IM-276 PD |
|
How many battle stations in USS Howard? |
3 |
|
FFE provides only a few seconds of protection during which stage? |
Flash over stage |
|
USS Howards fire pumps are rated at what capacity? |
1000 GPM |
|
Who assists the DCA with day-to-day routine to prevent fires? |
Fire Marshal |
|
What size is the hose connection on the discharge side of the Peri-jet eductor? |
4 inches |
|
Heat transmitted in the form of hot gases and smoke |
Convection |
|
Atropine combats... |
Effects of nerve agents |
|
How long will 5 gallons of AFFF last? |
60 seconds |
|
Kit used to identify chemical agents |
M-256AI |
|
Predetermined maximum amount of radiation |
Maximum permissible exposure |
|
MOPP |
Mission Operative Protective Posture |
|
M-8 liquid paper detects what agents? |
V&G nerve agents and 11 series blister agents |
|
Normal operating firemain pressure aboard USS Howard |
150 psi |
|
Primary purpose of FFE |
Firefighting |
|
Size of Electric Submersible Pump |
2 1/2 and 2 1/2 |
|
What does FL underlined mean? |
Flooding reported |
|
What condition maybe opened during prolonged periods of GQ at CO's permission? |
Circle Zebra |
|
Ratio of AFFF to salt water |
6% AFF, 94% salt water |
|
What is used as a last resort against class B fire? |
PKP |
|
EEBD are located where? |
Berthing and work spaces |
|
How long is the HALON Delay |
60 seconds +/- 10 seconds |
|
How long does a 15 pound CO2 bottle last during continuous use? |
40-45 seconds |
|
Effective range of 18 pound portable PKP bottle? |
4-6 feet |
|
What size SCBA do investigators and fire party use? |
30 and 45 |
|
Who is designated as USS Howard's Gas Free Engineer? |
Damage Control Assistant |
|
Spaces served by secondary drainage system |
3 generator room |
|
Type of firemain system on the USS Howard |
Vertical off-set loop |
|
What instruction directs repair locker personnel on all procedures for various damages? |
Repair party manual |
|
Space served by main drainage system |
AMR 1 |
|
Rated output of the box fan |
3200 CFM |
|
After being exposed to contamination how long will JSLET last? |
24 hours |
|
Condition during CBR attack |
Circle William |
|
Primary sound powered phone circuit |
2JZ |