• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

How is a Vlocity unit prepared to enter service?

Each Vlocity must undergo a primary preparation inspection once each day.

How is a Vlocity continuity test completed?

Leading Cab


- ensure park brake applied


- brake fully charged & PBC in RELEASE


- open EMERGENCY cock


- observe BP falls, cylinder rises


- apply and isolate the brake (move PBC to full application & isolate-key out)


Exterior Inspection (A side)


Check sanders, air/fluid leaks & cylinder gauges


Test Continuity in rear cab


- cut in brake (key in) move PBC to RELEASE


- observe BP does not rise & cylinders do not reduce (bc there is continuity)


- apply and isolate the brake (key out)


Exterior inspection (Side B)


In Front Cab


- cut in the brake (key in) move PBC to RELEASE


- observe BP does not rise & cylinders do not reduce


- close brake pipe EMERGENCY


- observe BP rises & cylinders reduce

How is a Vlocity traction motor interlock test completed?

- Open the external door and ensure the park brake is on


- Ensure that the main reservoir pressure is a minimum of 750 KPA


- Place to reverser in direction


- Move the power/brake controller to notch 2, apply HILLSTART and ensure engine revs do not increase


- Move the power/brake controller to OFF position


- Close doors

Vlocity Prep shortcuts

Vlocity Prep


Key in - activate cab


Reverser into neutral


Open a door


Park brake x 3


Emergency x 3


Reverser into direction


PBC into full service/off


Traction interlock - notch 2 - no revs (then close doors)


PBC into full service/off


Hill start


Creep up


Creep down


PBC into full service/off


Secondary brake test - cut in - reduce 100kpi notch 2, revs, increase kpi until knockout engages, put secondary brake to emergency. Cut out


PBC into full service/off


VC test


PBC into full service

Vlocity Prep shortcuts

Key in - activate cab


Reverser into neutral


Open a door


Park brake x 3


Emergency x 3


Reverser into direction


PBC into full service/off


Traction interlock - notch 2 - no revs (then close doors)


PBC into full service/off


Hill start


Creep up


Creep down


PBC into full service/off


Secondary brake test - cut in - reduce 100kpi notch 2, revs, increase kpi until knockout engages, put secondary brake to emergency. Cut out


PBC into full service/off


VC test


PBC into full service

Vlocity Prep shortcuts

Key in - activate cab


Reverser into neutral


Open a door


Park brake x 3


Emergency x 3


Reverser into direction


PBC into full service/off


Traction interlock - notch 2 - no revs (then close doors)


PBC into full service/off


Hill start


Test PBC


Creep up


Creep down


PBC into full service/off


Secondary brake test - cut in - reduce 100kpa, lap, notch 2, increase in revs, push secondary brake handle forward to reduce BP pressure until control governor drops out and engine revs to idle, lap, put secondary brake to EMERGENCY, lap. PBC to OFF. Cut out cock -BP to 500 kPa. PBC to FULL position.


VC test


PBC into full service


Conduct continuity test